Microgrid Systems Engineered for South Africa's Energy Future
ALEO POWER integrates PV, battery energy storage, diesel generation and its self-developed AMS controller into factory-tested, containerized microgrids — built for mines, factories and C&I sites across South Africa.
20ft container · PV + BESS + DG + AMS
Three Product Lines. One Integrated System.
Unified PCS + BESS + ATS + AMS integration, pre-configured and full-system tested before shipment.
C&I Battery Energy Storage
Liquid-cooled 520–523 kWh cabinets for peak shaving, backup and solar self-consumption at factories and commercial sites. IP65, tiered BMS.
View range →Containerised BESS
10ft / 20ft / 40ft containerized smart energy storage, 300 kWh–2.6 MWh per unit — scalable to utility scale for mines and industrial parks.
View range →ALEO Energy Management (AMS)
Self-developed control core: 150+ fault diagnostics, active power dispatch, demand response, local & remote monitoring.
View platform →Factory-Direct Advantages
Unified PCS, BESS, ATS & AMS
One integrated architecture, no multi-vendor finger-pointing.
Self-Developed EMS
In-house R&D enables flexible customization per project.
Solar–Battery–Generator Hybrid
Generator-set DNA since day one; true hybrid expertise.
Pre-Configured & Tested
Full-system testing before dispatch, plug-and-play on site.
On-Grid & Off-Grid
Customized topologies for weak-grid and remote sites.
Modular & Scalable
Expand capacity cluster by cluster as your load grows.
Engineering Support
Factory-direct supply with project engineering backing.
Remote Monitoring
Diagnostics and dispatch from anywhere, 24/7.
Where Our Systems Work
40,000+ m² of In-House Manufacturing
- Automated production & detection equipment, standardized processes
- Annual production capacity: 500 MWh
- Average manufacturing lead time: 35 days
- 40+ production & engineering team members
- Personnel deployed to 100+ project sites worldwide
- OEM / ODM customization supported
Zimbabwe Mining Microgrid
A dusty, high-temperature mining site runs on a PV-ESS-DG hybrid microgrid: solar carries the daytime load, batteries shift energy into the evening, and generators only start when needed. The same architecture fits South African mines and remote industrial sites.
Frequently Asked Questions
Do your systems work with South Africa's 50Hz grid?+
Yes. All ALEO systems are configurable for 50Hz and South African voltage standards, with grid-connection design support for NRS 097 compliance.
Can the system integrate with our existing diesel generators?+
Yes — hybrid PV–battery–generator operation is our core expertise. Our ATS and AMS coordinate generator start/stop to minimize diesel runtime.
What is the typical payback period in South Africa?+
With Eskom tariffs rising 8.76% in 2026, commercial solar-plus-storage projects in South Africa typically pay back in 2–3 years depending on load profile and tariff structure.
What is the lead time and shipping to South Africa?+
Average manufacturing time is 35 days. We ship to Durban and Cape Town and support on-site commissioning supervision.
Which certifications do your systems carry?+
Certification documents are available upon request — share your project requirements and we will confirm the applicable standards for your application.
Tell Us About Your Project
Email: jen@aleosystem.com
WhatsApp: +86 150 8947 5442
Room 401, No.35 DongSheng Avenue, Jiangsu, China