jen@aleosystem.comWhatsApp / Phone: +86 150 8947 5442 | Mon–Sat 8:30–18:00 (GMT+8)
ALEO POWER

Containerized Battery Energy Storage — Aleo Containerized Smart ESS Series by ALEO POWER

Aleo Containerized Smart ESS packs liquid-cooled LFP storage, power conversion, STS fast transfer, tiered BMS and the AMS control core into ISO-standard containers — from 1,044 kWh up to 3,793.92 kWh per unit, delivered as one factory-tested system that lands on a level pad and commissions in days.

1,044 kWh – 3.79 MWh500 – 1,000 kW integrated PCS20 ft ISO containersLiquid-cooled LFP · Tiered BMS
Get a Configured QuoteDownload Series Datasheet (PDF)
Containerized Energy Storage
2015Founded · 500 MWh annual capacity
35 daysAverage manufacturing time
5 yearsStandard product warranty
100+ sitesEngineers at project sites worldwide
Series Specifications

Containerized Series Specifications

Four catalogue configurations span the 1.5–3.8 MWh band — same SC52T05-314 LFP cluster platform (52.2 kWh, 1P260S), same liquid-cooled architecture, same AMS core. AC equipment is sized per configuration; battery configuration can be customized per project.

ParameterAP-1567 (AP750-1500L)AP-1568 (AP500-1000L/1500L)AP-2089 (AP1000-2000L)AP-H
Rated energy1,567 kWh1,044 / 1,568 kWh2,089 kWh3,793.92 kWh
Battery cluster52.2 kWh LFP clusters · SC52T05-314 cells · 3.2 V / 314 Ah · 1P260S
DC system voltage (V)832 (728 – 940)832 (728 – 940)832 (728 – 940)Per configuration
Charge / discharge rate0.5P / 0.5P0.5P0.5P / 0.5P0.5P
Integrated PCS750 kW (375 + 375)500 kW1,000 kWCustomized
STS (switch time)1,200 kW (600 + 600) · <10 ms600 / 660 kW · <10 ms1,200 / 1,320 kW · <10 ms—
Transformer750 kVA · 400/400 V500 kVA · 400/400 V1,000 kVA · 400/400 V—
Fire protectionAerosol + water sprayAerosol + water sprayAerosol + water sprayPer configuration
Dimensions W×D×H (mm)6058 × 2438 × 28966058 × 2438 × 28966058 × 2438 × 289620GP cabinet
Weight≈ 23,000 kg≈ 18,000 / 22,000 kg≈ 24,000 kg—
Cooling / protectionBattery liquid-cooled · IP65Battery liquid-cooled · IP65Battery liquid-cooled · IP65Liquid-cooled platform
Ambient range–25 ~ +55 °C–25 ~ +55 °C–25 ~ +55 °CPer configuration
Cycle life≥ 8,000 @ 25 °CPer datasheet≥ 8,000 @ 25 °CPer configuration
CertificationsAP-1567 / AP-1568 / AP-2089: IEC 62619 · IEC/EN 61000 · UN 3536 · UN 38.3 · MSDS — full set ships with each unit
The Problem We Solve

Solving Deployment Bottlenecks in Containerized Storage

Mega-watt-hour storage projects usually fail in the gap between battery delivery and a working plant. The Aleo containerized platform removes the gaps that stall site-built projects:

✓

The concrete-building trap. Site-built ESS rooms mean civil works, HVAC contractors, fire consultants and months of coordination before a single kWh flows. A container arrives pre-built — the building IS the product.

✓

Circulating currents between clusters. Paralleled battery clusters without cluster-level control fight each other and age unevenly. Our one-cluster-one-controller architecture isolates each cluster and prevents circulating currents.

✓

Thermal runaway anxiety. Insurers increasingly demand documented fire protection. Every container ships with aerosol + water-spray fire protection, comprehensive temperature control and external maintenance access for personnel safety.

✓

Fault blindness at scale. A 2 MWh plant hides faults until they become failures. Extensive fault diagnosis — more than 150 monitored items — plus tiered BMS catches degradation early, locally and remotely.

✓

Vendor finger-pointing. Battery vendor blames PCS vendor, PCS vendor blames BMS. Containerized ESS from one manufacturer means one FAT, one warranty, one engineering line to call.

✓

Commissioning drift. Integrators re-tune systems differently at every site. Factory-tested AMS dispatch logic ships pre-configured — commissioning confirms the configuration instead of inventing it.

Engineering Note — what 0.5P means for a container. P-rate is power relative to energy: a 2,089 kWh AP-2089 at 0.5P pairs with its 1,000 kW PCS for two full hours at rated power; the 1,567 kWh AP-1567 matches its 750 kW PCS the same way. An AP-H unit at 3,793.92 kWh / 0.5P holds roughly 7.6 MWh of usable daily cycling across two shifts. If your application needs short high-power bursts instead (frequency response), a higher-P configuration is quoted separately — sizing on energy alone misleads in both directions.
The Series

Four Configurations, One Containerized Platform

From the 1.5 MWh-class AP-1567/1568 to the 20GP high-capacity AP-H, every configuration shares the same 52.2 kWh LFP cluster platform and AMS control core.

AP-1567
CONTAINER · 1,567 kWh

AP-1567

MODEL AP750-1500L-01H · LIQUID-COOLED ENERGY STORAGE CONTAINER
  • 1.5 MWh-class liquid-cooled container with a 750 kW PCS in a 375 + 375 split and 1,200 kW STS (<10 ms transfer)
  • Aerosol + water-spray fire protection, IP65, –25 ~ +55 °C, cycle life ≥ 8,000 @ 25 °C
Rated energy1,567 kWh
Integrated PCS750 kW (375 + 375)
STS1,200 kW (600 + 600) · <10 ms
Dimensions W×D×H6058 × 2438 × 2896 mm
Weight≈ 23,000 kg
Cycle life≥ 8,000 @ 25 °C
Ideal for: mid-size C&I plants, campuses and distribution-scale peak shaving.
AP-1568
CONTAINER · 1,044 / 1,568 kWh

AP-1568

MODELS AP500-1000L-01H / AP500-1500L-01H · LIQUID-COOLED ENERGY STORAGE CONTAINER
  • Two rated energies on one 500 kW platform — 1,044 kWh (AP500-1000L) or 1,568 kWh (AP500-1500L)
  • 600 / 660 kW STS with <10 ms transfer, 500 kVA 400/400 V transformer, aerosol + water-spray fire protection
Rated energy1,044 / 1,568 kWh
Integrated PCS500 kW
STS600 / 660 kW · <10 ms
Dimensions W×D×H6058 × 2438 × 2896 mm
Weight≈ 18,000 / 22,000 kg
ProtectionIP65 · liquid-cooled
Ideal for: C&I energy parks, renewable-plus-storage sites and microgrid anchors.
AP-2089
CONTAINER · 2,089 kWh

AP-2089

MODEL AP1000-2000L-01H · LIQUID-COOLED ENERGY STORAGE CONTAINER
  • Two-megawatt-hour class container with a 1,000 kW integrated PCS and 1,200 / 1,320 kW STS (<10 ms)
  • 1,000 kVA 400/400 V transformer included — a complete grid-connected plant in one 20 ft unit
Rated energy2,089 kWh
Integrated PCS1,000 kW
STS1,200 / 1,320 kW · <10 ms
Dimensions W×D×H6058 × 2438 × 2896 mm
Weight≈ 24,000 kg
Cycle life≥ 8,000 @ 25 °C
Ideal for: utility-scale arbitrage, large microgrids and industrial peak management.
AP-H · 3,793.92 kWh
HIGH CAPACITY · 20GP

AP-H · 3,793.92 kWh

CONTAINERIZED ESS FOR LARGE-SCALE C&I PROJECTS
  • Highest-capacity catalogue unit: 3,793.92 kWh in a standard 20GP ISO container
  • Battery configuration 10P416S, scalable — built for high-capacity outdoor deployment
Rated energy3,793.92 kWh
Charge / discharge rate0.5P
Battery configuration10P416S
Form factor20GP cabinet
DeploymentOutdoor, high-capacity
AC outputCustomized
Ideal for: large-scale C&I projects, renewable smoothing and multi-megawatt cluster builds.
Decision Matrix

Decision Matrix — Which Configuration Fits Your Project

Project capacity, integrated power and expansion plans select the configuration — answer three questions first.

DriverChoose AP-1567 / AP-1568 ifChoose AP-2089 ifChoose AP-H if
Project capacity1 – 1.6 MWh≈ 2 MWh3.8 MWh per unit and above
Integrated PCS power500 – 750 kW1,000 kWCustomized per cluster
Site conditionsOutdoor yard, crane accessOutdoor yard, crane accessYard or substation site
Backup / cycling targetPeak shaving + daily cyclingArbitrage + microgrid anchorGrid-scale shifting
Expansion path+ containers+ containersMulti-container AP-H clusters
Category Comparison

Containerized ESS vs Site-Built ESS Rooms vs Genset-Only

Large backup projects still default to concrete ESS rooms or rows of diesel gensets. Both carry costs that never appear on the purchase invoice — figures below reflect typical industry-documented ranges.

MetricAleo Containerized ESSSite-built ESS roomDiesel genset plant
Time to energizationDays — factory-tested6–12 months incl. civil worksMonths — install + permits
Energy cost per kWh cycledR 0.8 – 1.5R 1.2 – 2.0 (integration overhead)R 4 – 6 (fuel + maintenance)
Fire protectionAerosol + water spray, factory-fittedDesigned per site, vendor splitFuel storage hazard
Round-trip efficiency≥ 90%85 – 90% (integration losses)25 – 35%
ScalabilityAdd containersNew civil works each phaseAdd gensets + fuel
Fault visibility>150 diagnosis items, remoteDepends on integratorEngine alarms only
Emissions on siteZeroZeroNOx, PM, noise, spill risk
Field Results

Application Cases — Containerized & Cluster Systems

Configurations from this series are running across Southeast Asia, Europe, Africa and Australia. Three representative patterns:

Malaysia

1.5 MW / 2.6 MWh C&I plant

Seven ALEO 215 kW PCS units, each connected to a dedicated battery cluster. The one-cluster-one-controller architecture enables precise cluster-level management and prevents circulating currents.

7 × 215 kW PCS · one cluster, one controller

Improved system safety, stability and efficiency across the full plant.

Lithuania

500 kW / 1,044 kWh arbitrage

A Lithuanian customer adopted the ALEO 500 kW / 1,044 kWh BESS to charge during low or negative wholesale prices and discharge when prices rise.

500 kW / 1,044 kWh peak-valley + capacity pricing

Significant direct economic benefit through price-arbitrage strategies.

Zimbabwe

1,500 kW / 2,580 kWh hybrid microgrid

PV–ESS–diesel hybrid microgrid system operating in a dusty, high-temperature environment — exactly the conditions standard C&I cabinets struggle with.

PV + ESS + DG 1,500 kW / 2,580 kWh

Stable power with renewable penetration in harsh site conditions.

Industry-wide containerized storage ROI pattern. C&I and utility-adjacent storage studies report typical payback of 3–6 years in markets with time-of-use tariffs or load-shedding, and 18–36 months where wholesale arbitrage or diesel displacement dominates. These are industry-wide patterns, not ALEO POWER guarantees — during quotation, your sales engineer builds a sized ROI worksheet from your tariff schedule, interval data and fuel invoices.
Compliance

Certifications & Compliance

Containerized systems are engineered to harmonized standards, with the certification documentation set shipping alongside each unit for your insurer, fire authority and lender.

IEC 62619 (cell & system safety)
UN 38.3 transport · UN 3536
IEC/EN 61000 EMC
MSDS documentation set
ISO 9001 factory QMS
ISO 14001 environment

Certificate numbers and issuing-body references arrive in the procurement package for your audit file.

Procurement Guide

Procurement Guide — Pricing · Lead Time · Installation

Containerized ESS is quoted as a configured system — final pricing reflects battery configuration, AC output, site conditions and integration scope. Every factor is itemized line-by-line in the quotation.

Pricing Factors

Final price reflects rated energy, PCS power, battery configuration, container size, fire-protection scope, certification documentation and any upstream PV or downstream load integration.

Indicative Lead Time

Average manufacturing time is 35 days from signed contract. Sea freight, site delivery and commissioning are scheduled separately by destination.

Minimum Order

One container. There is no batching requirement — a single AP-1567 ships with the same FAT documentation and commissioning support as a multi-container plant.

Installation

The container is positioned on a level pad or pier foundation, connected to AC distribution and communications. Typical on-site work is days, not months; commissioning confirms the factory configuration.

Operator Training

Two-track training — operations and preventive maintenance — delivered during commissioning. Your own staff leave able to run the system and respond to the >150 monitored fault items.

Warranty & Support

Five-year warranty for long-term, worry-free operation, lifetime remote engineering support, and spare-parts recommendations supplied at delivery.

Engineering & Procurement Toolkit

Engineering & Procurement Toolkit

Worksheets and decision helpers to size your containerized storage, estimate payback and prepare your site.

Container Sizing Worksheet

Match daily MWh throughput and outage window to an AP-series configuration.

Download worksheet →

Site & Grid Connection Checklist

Pad, crane access, protection settings and interconnection requirements before you order.

Open checklist →

Fire Compliance Document Pack

What insurers and fire authorities typically request for containerized ESS approvals.

View pack →

Diesel Displacement Calculator

Compare genset runtime vs battery cycling OPEX at your local fuel price.

Open calculator →
FAQ

Frequently Asked Questions

Straight answers to the questions procurement teams ask about containerized storage.

What if my project needs a configuration outside the AP-series catalogue?+

The AP-series (AP-1567, AP-1568, AP-2089 and AP-H, from 1,044 kWh to 3,793.92 kWh) are catalogue configurations with defined rated energy and integrated PCS. For projects outside the catalogue — different container layouts, cluster counts or output ratings — our engineering team delivers a configured design with a complete drawing set; quote per site.

How fast can a containerized system be commissioned?+

Average manufacturing time is 35 days from contract. On site, positioning on a level pad, AC and communications connection and commissioning typically take days — the system ships factory-tested, so commissioning confirms the configuration instead of building it.

How does the one-cluster-one-controller architecture help my project?+

Each battery cluster runs on its own controller, enabling precise cluster-level management and preventing circulating currents between clusters. In the Malaysia 1.5 MW / 2.6 MWh plant, seven 215 kW PCS units each serve a dedicated cluster — improving system safety, stability and efficiency.

What fire protection is included?+

Every AP-series container ships with aerosol + water-spray fire protection, comprehensive container temperature control and external maintenance access for personnel safety. Certificate numbers and issuing-body references arrive in the procurement documentation set.

Can the container work in hot, dusty or coastal environments?+

Yes — the platform is proven in high-temperature Australian VSG sites and dusty Zimbabwean hybrid microgrids. IP65 enclosure, air conditioning and comprehensive temperature control are part of the container design; specify your site conditions in the inquiry and the configuration is adjusted accordingly.

What monitoring and dispatch functions are included?+

Local and remote monitoring, remote scheduling of energy-storage operation, smart operation data management, active-power dispatch and demand response, with more than 150 fault-diagnosis items and tiered BMS. An integrated LCD for real-time monitoring is optional.

What after-sales support does ALEO POWER provide?+

Five-year warranty, lifetime remote engineering support (email / phone / video), spare-parts recommendations at delivery, and operator training during commissioning. Our engineers have been to more than 100 project sites worldwide.

Methodology

About This Containerized ESS Guide

ALEO POWER manufactures containerized storage and microgrid systems. Rated energies, P-rates, battery configurations, dimensions and electrical parameters on this page come directly from the current product series (AP-1567, AP-1568, AP-2089 and AP-H). Application cases summarize documented ALEO POWER installations; ROI ranges are industry-wide figures drawn from published storage research — context, not guarantees. Every quotation includes a sized analysis matched to your tariff schedule, interval data and site conditions.

Ready to configure a containerized ESS for your project?

Send us your daily MWh requirement, site conditions and grid connection details. We'll reply within 1 business day with a configured quotation and reference cases from your region.

Get a Configured QuoteWhatsApp Our Engineers